Solutions Custom Parts Manufacturing Ready-to-Install Assemblies Supplier Consolidation & BOM Testing & Traceability ProvenCell®
Capabilities
Components Component Families Motor Housings Precision Gears Shafts & Mandrels Instrument Enclosures Rigging Roller Guides Titanium Parts Wheels & Pulleys Couplings & Fittings Assemblies & Product Families Gearbox Assemblies Metal Carts & AGV Frames Robotic Actuators Cooling Assemblies Welded Frames Steel Stillage
Industries
Company About CSMFG Quality IP Protection Buyer FAQ
Request a Quote →
Quality

Open-book quality.
Audit us any time.

ISO 9001 certified with an open-book policy: customers may inspect our incoming-material records and the complete quality paper trail. Quality is engineered into the process—then verified, recorded and archived.

System & Documentation

What stands behind every shipment

  • ISO 9001 certified quality management system
  • PPAP up to Level 3 and First Article Inspection reports
  • EN 10204 3.1 material certificates; accredited third-party lab testing
  • CMM measurement, calibrated gauge management, dedicated inspection room
  • AQL-based sampling plus 100% checks on critical features
  • Serialization & archived inspection images on assembly programs

Incoming material

Chemistry, hardness and certificate verification before release to production.

In-process control

SOP-driven checkpoints; SPC on critical dimensions; weld and coating tests (ultrasound, salt spray, thickness).

Final inspection & function test

Dimensional reports, functional testing per agreed spec, AI vision checks on assembly lines.

Records & traceability

Results linked to lot or serial number and retained—query any shipment, years later.

Quality Targets
≥90%First-pass yield on new products
≥98%Yield on mature products
ZeroKnown defects leaving the factory
≥95%On-time delivery
Photo Inspection room: CMM measuring a machined housing; inspector at a screen with a dimensional report; calibration labels visible on gauges.

Send one part—or send the whole BOM.

Engineers respond within 24 hours. Part quotes in 1–3 days. BOM consolidation proposals in 5 business days. English and German spoken.